FAT, SAT, Commissioning

FAT, SAT, Commissioning

Services

Highly experienced engineering team provides all kind of Factory Acceptance Test (FAT) involving simulation software and other tools at our fully equipped staging facility this vigorous testing. Validation and quality assurance would ensure that the system is fit for purpose and ready to ship.

The Site Acceptance Test (SAT) is to assure the system condition after successful installation is safe and ready to begin commissioning, and assuring that there is no damage or change during shipment. 

The commissioning phase will be the testing of functional requirement and the approved design together in a live real plant environment to ensure the system is ready to go live followed by system handover. A team of engineers will be mobilized to site to provide SAT/Commissioning support, daily reports, toolbox meeting, LOTO and other plant HSE policies will be strictly followed


Detail Product → ← Back to Category
Certification
ISO 37001 with KAN Control System Arena Para NusaUKAS AND ISO 9001 ISO 14001 ISO 45001
News Release
Perkembangan teknologi telah membawa perubahan yang signifikan bagi dunia industri. Digitalisasi, otomatisasi, dan integrasi sistem mendorong perusahaan untuk terus beradaptasi agar tetap kompetitif di tengah dinamika bisnis yang semakin kompleks. Namun, transformasi industri tidak hanya bergantung pada penerapan teknologi, tetapi... Read More